Questions answered

The TM44 air conditioning inspection duty explained from the official guidance, then free quotes from energy assessors covering your building.

Get TM44 inspection quotes

The questions we get

What is a TM44 inspection?

The statutory inspection of an air conditioning system by an accredited energy assessor, named after CIBSE TM44, the publication describing the assessment methodology. In England and Wales it falls due wherever effective rated output exceeds 12kW, and gov.uk allows no more than five years between one inspection and the next.

What size air conditioning needs a TM44 inspection?

More than 12kW effective rated output. Gov.uk states this includes systems made up of individual units each under 12kW whose combined effective rated output is more than 12kW. It also states that units in a building controlled by a single person count as one system.

How often is a TM44 inspection needed?

No more than five years apart, on gov.uk's wording. A separate clock applies when control changes hands: take over a system with no report from the previous operator and gov.uk gives you three months from the handover date.

Who is responsible for getting the inspection done?

The person who controls the operation of the system. Gov.uk describes that as the person controlling its technical functioning, not someone who merely adjusts the temperature. It states that the owner usually controls the system even where day to day operation is contracted out. Under a full repairing and insuring lease, the occupier controls it.

What happens if you do not have a report?

Gov.uk states the penalty for failing to have an air conditioning inspection report is fixed at £300. A further £200 penalty applies for failing to give a Trading Standards Officer a copy within seven days of a request. A copy can be requested up to six months after the last day for compliance.

Is a TM44 inspection the same as an F gas check?

No. The gov.uk air conditioning inspection guidance places F gas inspection outside its remit. So the two obligations run in parallel on different clocks: this one on a five year cycle by building, F gas on a frequency set by refrigerant charge. Assume neither is covered by your maintenance contract until someone shows you it is.

Is this quote service really free?

Yes, free to you, with no obligation to accept any quote. We pass your details only to EPC and energy assessors covering your area; we may receive a fee from those providers, which is how the service is funded.